ON A PROJECT

Caught in week six,
not the claim letter.

HEARTBEAT is looking for its first design partners among EPC and infrastructure teams. The scenarios below show how a delivery organisation would put it to work. They are illustrative, and stay labelled that way until our first customers go on record.

Illustrative scenarios drawn from our pilot programme design.

HIGHWAY · EPC

The stall nobody flagged

A GFC drawing sign-off sat with the client for 12 days while crews idled. The engine read the I-term climbing and surfaced APPROVAL_STALL as structural — a sponsor escalation unlocked 11.5 WTU, six weeks before the review.

Early warning: ~14 days ahead of the milestone review
METRO · PACKAGE

Rework routed, not buried

A failed compaction test at Ch 2+800 would normally hide in a spreadsheet. HEARTBEAT rerouted 16 hours of rework onto the critical path and flagged the downstream WMM block automatically.

Zero silent QC failures · every defect traced to its task
TOWNSHIP · PHASE

A client portal owners trust

JV partners and buyers watch a calm, status-words-only portal with sign-off and concern flows — and never see anything commercially sensitive, because denials are enforced at the row.

Client-safe by construction · hard denials, not filters
FAB · CLEANROOM

Zero-defect, measured

Tool hook-up under unforgiving QC. p-charts with 3σ control limits flag out-of-control runs before they become a schedule problem, and the rework economy feeds the forecast.

Statistical QC · control limits, not gut feel
BY DESIGN

What it does on every project.

Everycorrection shows the arithmetic behind it
Offlinefield updates wait on the phone and send themselves when signal returns
No guesswhen there is no data, it says so instead of showing a number

Be one of the first on record.

We're partnering with a small number of EPC and infrastructure teams for design-partner pilots. If that's you, let's talk.