SOLUTIONS

Built for the way your industry
actually delivers.

One platform, configured — never rebuilt — for the corridor, the tower, the township and the fab. The generic tracker adapts to your objects, gates and language through templates, so the same autopilot works across every vertical.

BY INDUSTRY

Four verticals, one system of record.

Each template ships the objects, gates and roll-ups that industry expects — configuration, not a fork.

🛣
FLAGSHIP

Infrastructure & EPC

Highways, metro, bridges and plants. Chainage-based progress, QC gates, subcontractor SLAs and monsoon-aware forecasting. Catch the claim six weeks before the claim letter.

📡
SITES AT SCALE

Telecom rollout

Thousands of sites, each a typed object with its own readiness path to RFS. Vendor pledges, acceptance packs and site-level status that rolls up to the programme.

🏙
UNITS & PHASES

Real estate & township

Towers, units and plots as first-class objects. Phase gates, handover/occupancy readiness, and a client portal your buyers and JV partners can trust.

🔬
ZERO-DEFECT

Semiconductor & fab

Cleanroom zones, tool install and hook-up with unforgiving quality control. p-charts with control limits and a rework economy the engine actually reasons about.

INFRASTRUCTURE & EPC · IN DEPTH

The corridor tells you it's slipping. HEARTBEAT hears it first.

A stalled drawing sign-off, a failed compaction test, two weeks of falling morale — individually they look like noise. The engine reads them together and sees the structural stall while there's still time to act.

  • ⛏
    Chainage & quantity progress from the field in 45 seconds.
  • ⚑
    QC failures reroute rework onto the critical path automatically.
  • ₹
    Subcontractor SLAs and commercial milestones tracked, not chased.
  • ☔
    Weather & leave aware — the forecast knows about the monsoon and who's off.
NH-544 · Package 3NEEDS ATTENTION
GSB Ch 4+20082%
Compaction Ch 2+800rework
GFC sign-off rev Cstalled 12d
Cause: APPROVAL_STALL (0.86) · escalate to sponsor → unlocks 11.5 WTU · overtime withheld (fatigue guard)
BY ROLE

Everyone gets the view they need — and only that.

The same source of truth, presented by archetype. Access is a product opinion, enforced at the row.

◆

PMO & portfolio lead

An attention-ranked portfolio, capacity across the programme, and a governed intake front door. Read the whole book in one screen.

▦

Project manager

Board, backlog, timeline and the autopilot verdict — with the arithmetic — so status meetings become decisions.

🏗

Contractor / EPC

Your packages, your SLAs, your acceptance. Governed as a first-class party, not an email thread.

⛑

Site engineer & crew

A 45-second offline update in हिंदी/मराठी, with photo + GPS evidence. The signal that powers everything upstream.

◔

Client / owner

A calm, status-words-only portal with sign-off and concern flows — and hard denials on anything commercially sensitive.

🎚

Executive sponsor

The go-live readiness score and the early-warning that lands weeks before a review, not inside a claim.

Tell us your project shape.

We'll spin up the matching template — corridor, site rollout, township or fab — and show the autopilot steering your kind of work.